Collect measured site information before requesting a recommendation. Average weekly volume alone does not size a baler. Norton and the manufacturer must confirm machine capacity, clearances, power, handling, and installation requirements.
Facility / location / contact:
Materials to bale and contamination:
Normal cardboard pounds per week:
Peak pounds per day / collection window:
Hours available to process peak material:
Peak pounds ÷ processing hours = required lb/hr:
How volume was measured / dates:
Current pickups / container size / haul costs:
Available floor width × depth:
Clear height / door and service clearances:
Electrical voltage / phase (qualified confirmation):
Feed method / operator staffing:
Bale storage / forklift or handling equipment:
Recycler required bale dimensions / weight:
Delivery access / site constraints:
Growth, shifts, and seasonal peaks:
Compare the complete installed proposal
Equipment · freight · rigging · electrical work · installation · operator training · wire · maintenance · pickup arrangements. Record assumptions and exclusions in the quote.
Illustrative calculation: 1,500 pounds arriving in a four-hour processing window requires an average of 375 pounds per hour during that window, before allowing for loading, tying, ejection, interruptions, and growth. This is a planning example, not a machine rating.